Time Study in production planning

The general procedure followed in systematic carrying out the time study in production planning is as follows: 1. Select the work to be studied. 2. Record all the information about the work, operator and surrounding conditions. 3. Break down the each operation into small elements. 4. Examine each element to ensure that the most effective method and motions are…

Read More

Break-even Analysis

The break-even analysis in production management and industrial engineering consists of total cost (i.e. fixed cost and variable cost) and sales revenue. A break-even analysis is a financial tool which helps you to determine at what stage your company, or a new service or a product, will be profitable. In other words, it’s a financial…

Read More